MESSETERMINE: 25.03.2012 - 29.03.2012 SOGAT 2012, Abu Dhabi (UAE)
产品搜索
展销会日期
新闻公告
OHL Gutermuth is supplying the main, shut-off and regulating valves for the thermal conducting oil in the world’s largest solar power station, which is currently under construction in Spain.
更多


test
最新消息

12.02.2008
 
  OHL Gutermuth is supplying the main, shut-off and regulating valves for the thermal conducting oil in the world’s largest solar power station, which is currently under construction in Spain.
   


20.11.2007
 
OHL Gutermuth supplied valves for cooling water at up to 35 bar to a large power station in Russia in 2007. Nominal diameters up to 1600 mm!
   


02.11.2007
 
  Valves for 1200 °C and low noise applications for dp up to 160 bar.
   


09.10.2007
 
  OHL Gutermuth is supplying valves worth several million euros to the largest gas purification plant, which SINOPEC is building in Sichuan. Switching valves are being supplied to Petrochina for several CBA plants in the same region, since the customer was highly satisfied with the original equipment supplied by Gutermuth in the 1980s.
   


20.09.2007
 
  3-way hot gas mixing valves, designed for an operating temperature of 1000 °C with a size of 80° are being supplied to QatarGas. Unit weight is 6 tonnes before brick lining.
   


18.09.2007
 
 
   


12.09.2007
 
  OHL Gutermuth is supplying special 3-way valves for the engine testing rigs of a Formula 1 racing team, which must switch with a regulator-controlled actuation time of < 0.1 sec / 90°. It was only possible to undercut this time by means of the use of special hydraulic components and optimised valve design.